How to Become a Certificated 14 CFR Part 145 Repair Station

Following the links in this article to FAA website gives a good idea of the Part 145 certification requirements (sourced by Kuttan as a reference for domain specialists):


The 14 CFR Part 145 certification process provides for interaction between the applicant and the FAA from initial inquiry to certificate issuance or denial. It ensures that programs, systems, and intended methods of compliance are thoroughly reviewed, evaluated, and tested. Any questions about this process should be directed to the nearest Flight Standards District Office (FSDO).

The certification process consists of five phases:

* Preapplication Phase
* Formal Application Phase
* Document Compliance Phase
* Demonstration and Inspection Phase
* Certification Phase

A. Preapplication Phase

(1) Preapplication Statement of Intent (PASI), FAA Form 8400-6

(a) The PASI will be used by the Manager, Flight Standards Division or designee to evaluate the complexity of the proposed operation. This allows the establishment of the certification team to be based on the complexity of the certification. A Certification Project Manager (CPM) will be designated as the principal spokesperson for the FAA during certification.

(b) An applicant should conduct a thorough review of the appropriate regulations and advisory material to provide guidance for personnel, facility, equipment, and documentation requirements. As a result of this review, the applicant must address, in FAA Form 8400-6, Preapplication Statement of Intent (PASI), how these requirements will be met.

NOTE: Submittal of the PASI by the applicant shows intent to initiate the certification process.

(2) Preapplication Meeting. The preapplication meeting should be held in the district office. This will allow the applicant to become familiar with the assigned FAA personnel.

(3) Application for Repair Station Certificate and/or Rating, FAA Form 8310-3. During the preapplication meeting the applicant should be instructed on how to complete the application.

(4) Formal Application Attachments. During the preapplication meeting requirements for the application attachments should be discussed. This discussion should include the following:

(a) Manual. The applicant should be encouraged to use Advisory Circular 145-9, which provides information and guidance material for all repair station certificate holders or applicants under Title 14 of the Code of Federal Regulations (14 CFR) part 145 to develop and evaluate a repair station manual (RSM) and quality control manual (QCM). The material presented in this AC describes an acceptable means, but not the only means, to develop a manual and comply with the referenced regulations. The manual should allow the user to understand its content without further explanation and must not contradict any regulatory requirements.

NOTE: It is the applicant's responsibility to develop manuals and procedures that ensure safe operating practices and compliance with the rules. The team can offer suggestions for improvement but must not "write" the material.

(b) Letter of Compliance. The letter of compliance will ensure that all applicable regulatory requirements are addressed during the certification process. Listing each applicable FAR section, in sequence with the FARs, does this. After each listed regulation, there must be a brief narrative or specific reference to a manual/document that describes how the applicant will comply with that regulation. The letter of compliance must be reviewed to ensure that the applicant has a clear understanding of the regulation and that the proposed method of compliance meets the intent of the regulation.

(c) Letter stating compliance with 14 CFR 145.53(c) or (d).

B. Formal Application Phase. To begin the Formal Application Phase the team will receive the application, and attachments. As a rule, the team will meet with the applicant after receiving the formal application package. All questions about the proposed operation, the formal application, and attachments should be resolved at this time. The meeting should consist of the certification team members and all key management personnel from the applicant's organization.

Corporation Papers: If a corporation makes the application, the FAA must have a copy of the Certificate of Incorporation by the State and any accompanying documentation to evaluate the eligibility of the applicant.

Drug and Alcohol Program: All applicants wishing to perform maintenance functions on Air Carrier / Commuter aircraft or components must provide a drug and alcohol program to be approved by the FAA. The Drug Abatement Home page is located at the following address: http://www.faa.gov/about/office_org/headquarters_offices/avs/offices/aam/drug_alcohol/

C. Document Compliance Phase. In this phase, the application is thoroughly reviewed for approval or disapproval, and the manual and related attachments are reviewed for acceptance or rejection. This review ensures both conformity to the applicable regulations and safe operating practices. This phase is done in the district office by the certification team.

D. Demonstration and Inspection Phase. In this phase the certification team ensures that the applicant's proposed procedures are effective and that facilities and equipment meet regulatory requirements. The Certification Project Manager must decide if demonstrations will be required.

E. Certification Phase. Once the applicant meets the regulatory requirements of CFR Part 145, the certification team will issue the repair station certificate and operations specifications with the appropriate ratings.

Forms
* FAA Form 8000-4, Air Agency Certificate
* FAA Form 8000-4-1, Repair Station Operations Specifications
* FAA Form 8060-4, Temporary Airman Certificate
* FAA Form 8310-3, Application for Repair Station Certificate and/or Rating
* FAA Form 8400-6, Preapplication Statement of Intent
* FAA Form 8610-2, Airman Certificate and/or Rating Application, if applicable
* FAA Form 337 , Major Repair and Alteration. Instructions are in AC43.9-1E.
* FAA Form 8130-3 , Airworthiness Approval Tag. Instructions are in Order 8130-21D.

References
* 14 CFR Parts 43, 45, 65, 121, 125, 135, and 145
* Advisory Circular 145-9, Guide for Developing and Evaluating Repair Station Manual and Quality Control Manual.
* Advisory Circular 145-5, Repair Station Internal Evaluation Programs.
*SFAR 36
* Order 8300.10, Airworthiness Inspector's Handbook, Vol. 2, Chapters 161, 162, 164, and 165 .

* 145 Certification Job Aid.
* 145 Repair Station Manual & Quality Manual Job Aid.

The following information is used by FAA Inspectors as guidance information during the certification process. This information would be very valuable to the applicant to review.

Airworthiness Inspector’s Handbook: Order 8300.10

8300.10 Vol 1 CHAPTER 4 The generic process for certificating organizations.

8300.10 Vol 2 CHAPTER 161 Introduction to CFR Part 145.

8300.10 Vol 2 CHAPTER 162 Certificate CFR Part 145 Domestic/Satellite Repair Station.

8300.10 Vol 2 CHAPTER 164 Evaluate CFR Part 145 Manual Revisions.

8300.10 Vol 2 CHAPTER 165 Evaluate CFR Part 145 Repair Stations facilities and equipment.

8300.10 Vol 2 CHAPTER 24 Certificate Repairman/Added Privileges.

AC 65-24 Advisory Circular for Certification of a repairman.

AC 65-31A Training, qualification, and certification of Nondestructive Inspection (NDI) personnel.

AC 120-78 Advisory Circular for Acceptance and use of electronic signatures, electronic recordkeeping systems, and electronic manuals.

AC 145-9 Guide for Developing and Evaluating Repair Station and Quality Control Manuals

AC 145-10 Repair Station Training Program

Suspected Unapproved Parts (SUP) Office Home Page.

Nondestructive Testing (NDT) CHECKLIST for use with Visual, Penetrant, Magnaflux, Eddy Current, Ultrasound, and X-ray.

Apr 23, 2009

Assumptions, Aggressive Scheduling and Bad News...

Article by Mike McLaughlin:

No one likes to deliver (or hear) bad news about a project, whether it's a schedule slip or a budget overrun. These revelations are not exactly relationship-builders. For starters, your client sponsors have to own up to colleagues and others that your best-laid plans have gone awry. At the very least, this leads to questions about their judgment; at worst, it could be a career limiter.

But the bad news gets worse. It also damages your credibility. One consultant who had to backtrack on a project schedule found himself in an argument about every subsequent estimate he made for the project. In the heat of those moments, he got stuck in the middle of finger-pointing campaigns as people looked for someone to blame. In the meantime, the project lost momentum as the team dealt with the distractions that inevitably crop up when things don't go according to plan.

Assume Nothing

Without a doubt, some problems come out of left field to subvert carefully designed project plans. It's common, for instance, for clients to make changes to the project team, or even the project sponsor, at the last minute. Such changes can wreak havoc with a project plan, and are almost impossible to foresee. For many projects, though, the seeds of trouble are sown long before a project kicks off. In fact, it's possible to trace many future problems to decisions you and the client make during the sales process.

Of all the factors that contribute to project snafus, assumptions top the list. Think of assumptions as disasters waiting to happen. And the more assumptions you make about a project, the greater the likelihood that one of those disasters will hit.

Let's say, for example, that you assume you will have access to client executives when you need it to complete specific tasks. Or, maybe you make assumptions about how quickly the client will make decisions that impact project progress. Of course, you work through these assumptions with the client and make it clear how the assumptions affect the schedule and the overall plan.

Typically, clients will give the nod to such assumptions and you press ahead with the project. Everyone feels good because they think they have covered all the bases. But if any assumption doesn't pan out, a problem remains. And it doesn't matter who made the assumption or why. You and the client must still dig yourselves out of a hole.

Obviously, the easiest way to mitigate this risk is to assume as little as possible. But you can't remove all assumptions, so focus on those that have the highest potential for impact on critical path activities. So, if you do make assumptions about the availability of executives for key meetings, nail down that access before you start the project. Look at all your critical path activities and determine if assumptions will govern their successful completion. If so, resolve them early. If you don't, a project delay is most likely in your future.

You Want It When?

More often than not, clients want fast results. Who can blame them? Once clients agree to hire you, they want things to move along as quickly as possible. In response, you may be tempted to make small cuts to the duration of specific tasks in an effort to shorten the project schedule. The inevitable result of chipping away at your plan is that the project approach is no longer adequate to meet the objective. And a project delay ensues.

Don't fall into the trap of shortening your schedule unless you can see a commensurate reduction in what the client expects you to deliver. When clients push on the pace of the schedule, stick to your guns unless they are willing to change the work you are to do. Your client relationships will benefit and you'll deliver what you promised. That's not to say that you shouldn't plan an aggressive schedule, because you should. But be careful that you truly understand the implications of changes to your schedule before you agree.

An Ounce of Prevention...

Bad news about projects is due to more factors than I have space to write about in this short article, but making too many assumptions and an overly aggressive schedule are two of the top culprits. Whatever the causes, you can take three actions early in your planning process to make any project path smoother and more productive.

First, ensure that your project logic is firmly rooted in reality. Examine your proposed approach to the project. Ask yourself if you see precisely how your proposed work plan will lead to the value you've promised. It is easy to miss one or two small steps that are essential to achieving the client outcome. And once you miss an essential task--or underestimate its duration--trouble will follow. Validate the details of your approach with your client, and really go through the details. This one small step, taken early in your planning process, can spare you from enormous stress as the project progresses.

Second, express your estimated project completion date in a range, instead of using a fixed date. For an eight-week project, for example, prepare an initial schedule that assumes a project duration of eight to ten weeks. Then, once the project is underway, firm up your completion date. After all, no matter how good you are at estimating the time it will take to complete each task, there are always unknowns. By keeping a flexible end date, at least for a short time, you'll be able to size up the actual project environment and firm up the schedule.

Finally, plan for a few early project milestones as a way to see how your schedule and budget are holding up. You'll never know how good your plan is until people begin to execute against it. So, test the team early to shake the kinks out of your plan.

Once a Problem Arises

Every project has its up and downs, and some problems are unavoidable. When you hit that inevitable bump in the road, it's a test of your leadership. No matter how unpleasant it may be, confront the issue with the client without delay. Some consultants will try to make adjustments on the fly to avoid admitting a mistake. That usually makes the situation worse.

The bad news about a project will not improve with age, so get to your client as soon as you suspect a problem. Most importantly, when you have to be the bearer of bad news, always be ready to present two assurances: That you know the answer to the problem, and proof that it won't happen again in the future.