Jul 31, 2009

Software Over-engineering Trap - Ways to Avoid them!

Author: Shailesh Goswami, Professional Development Resource Manager, Microsoft Global Services India

[A good read on handling Non functional requirements and Requirements Traceability, sourced by Kuttan]:


To get success in a software project, Software requirements analysis is critical. The new system must be as good in performance as the legacy system Software requirements analysis is critical to the success of a software project.

Inappropriate gathering of software requirements is a major reason for projects not achieving the desired results. A META group research indicates that approximately 60-70 percent of IT project failures occur directly as a result of poor gathering of requirements, analysis, and management. Unclear requirements often increase the tendency amongst software designers and architects to over-engineer the solution. Here we will take a look at the ‘software over-engineering trap’ and the ways to avoid it.

In a recent recovery project, we were called to ‘fix’ the software developed by the customer’s own team. The testing team found that the software, though claimed to be highly scalable, was too slow and unresponsive, especially on smaller number of users. On investigating, we found that though the software architecture used the most fanciful technologies, implemented nifty design principles, and seemed 'perfect', it did not work when deployed. This is a classic example of what I call the 'software over-engineering trap'. Let us take a closer look at why we fall into this trap.

Top Reasons for Getting into the ‘Over-engineering' Trap

1. Lust for using latest technologies:

Being abreast of all latest technologies available in the market, it is natural for software architects to have an inclination to use them. But in the eagerness to use the latest technologies, one should not lose sight of whether it is actually required for the project at hand.

2. Lack of clarity on non-functional requirements:

Often the customer is not able to convey the requirements in the best possible way and may also be not sure on the levels of performance and scalability required. In such situations, the software architects may tend to take the safest route: create a software architecture that is straight from the textbook.

3. Limited understanding of technology at client-side:

Customers may not always have a tech-savvy member working directly with them to objectively review what the architects produce.

4. Background of the architects or designers:

Many times, architects play on their strength. They propose what they know the best.

All problems have a solution. We can avoid the trap, by enforcing some simple and effective steps. I call them 'powers' and I believe in them as if they were God sent. Nothing fanciful, but they really work.

The Power of Non-functional Requirements

In contrast to the functional requirements that determine how the system would behave, non-functional requirements (NFRs - that specify things like performance, scalability, and security requirements) are more intangible and ambiguity prone. But they are critical to the overall success of the software project and can dominate the design and architectural decision. Unfortunately, we tend not to give them their due importance because of the reasons discussed earlier. Both customers and analysts are very good at capturing functional requirements, but capturing non-functional requirements is not as easy. In many projects, NFRs are either not defined or defined very vaguely with fancy sounding open statements or defined very late in the game, almost after the software has been developed. Thanks to Mr. Murphy, the process of capturing non-functional requirements is paved with unusually high number of hurdles and speed-breakers. The end result is that we ignore the NFRs and move ahead in order to avoid delays in the project.

For example, if the customer has minimal scalability requirements, then one must carefully evaluate the need of service-orientedness (assuming no other pressing need for service orientation exists). In our recovery project example, we found that the scalability requirements were not captured properly. In reality, the customer had very minimal scalability requirements, but due to unclear requirements the designers ended up designing a highly scalable multi-layered service oriented system. As a result the system became too slow when deployed in production environments. Most architects know that each design decision comes with a trade-off and clarity in non-functional requirements help us make that decision meaningful to the customer situation.

Here are some guidelines that, when followed, can help us exploit the power of NFRs and make our architecture much closer to the real customer requirements:

1. Make NFRs non-negotiable:

Irrespective of how many hurdles you may face in gathering accurate NFRs, one rule I always follow is to define a clear ‘must-achieve’ milestone by which the customer must give you all non-functional and operational requirements before the team moves to the coding phase. No sign off on NFRs, no movement in the project.

2. Document NFRs in the form of data:

Document NFRs in the form of real numbers and not as open statements. For example, rather than saying, "The new system must be as good in performance as the legacy system," one must get customers to give data in the forms such as - 'the new system must load in less than 1 second' or 'the search page must provide all matching employee records in no more than 3 seconds'. Adopt this data-centric approach for scalability, installation, performance, security, and other non-functional requirements.

3. Focus on deployment:

Look at the way the customer is going to deploy the software after you develop. Would it be deployed on one machine, or multiple servers, or a cluster of machines? Get an agreement on the physical deployment of the software early in the game. I particularly recommend that each team member prints the physical deployment diagram and pins it up on his or her desk.

4. Data flow diagrams and threat modeling for security:

Look at the security aspect very carefully. What level of security is needed? Which portions of the system should be more secure than the others? What access levels and permissions you must provide to various roles that exist in the application? I found preparing a basic ‘data flow diagram’ very helpful in determining what type of security is needed at each level of the software. Using this simple data flow diagram, it’s very easy to figure out where a customer is exchanging personal information that requires higher security versus normal information. Many architects also perform what is known as 'threat modeling' based on such diagrams and other inputs before proceeding ahead with design.

The Power of Traceability Matrix

The capability to map the requirements increases the likelihood of delivering a software product that fulfills the customer’s needs. Using a 'traceability matrix' for this purpose is highly recommended. Most likely, you may have heard about this many times before. However, the simple submission here is that most companies either do a mere lip service to it or prepare this matrix in later phases of the lifecycle.

When used right from the start, this matrix helps us trace back the architectural considerations to real customer needs. Whether the customer asked you to prepare a traceability matrix or not, you should do it in your own interest. In this matrix, one would write down specific aspects of the architecture like componentization, service-oriented-ness, configurability, and dynamic discovery and map them to the customer requirement, especially the NFRs captured earlier. In the next column, one would also write what the drawback of using each of these architectural considerations is.

In the end, you would write down what type of hardware and deployment environment would be needed for this design to deliver results. Once complete, this helps us to re-consider our design in the event it is not mapping to any customer requirement, or is having more negatives than positives. Or, if the hardware needed is much more demanding than what the customer is going to use.

The Power of Demonstrations

As they say, ‘the proof of the pudding is in eating’. And the proof of your software architecture is after you see it running live to your total satisfaction! In addition to delivering software in optimally frequent intervals, you will particularly find the concept of creating ‘min-deployment lab’ very useful. This lab mimics the real deployment environment that customer has signed up for. It has the same firewall, DMZ, domain, and security settings as the real environment would. This environment is first used by developers and testers to deploy the system and perform the testing before releasing the software. Later, the same deployment lab can be used by the customer’s teams for phase-end demonstrations. A small investment in such labs gives great ROI, as compared with the cost of fixing failed projects. Your development teams would be surprised to see your own system not behaving as intended or even crashing when really deployed in this mini-lab. This would help them solve some critical deployment level defects early in the game. If setting up a lab at the development location is not always feasible, then the project teams must look at using the customer staging and testing environments during the development cycles.

In today’s environment, with the advancements in development, deployment, and virtualization tools, setting up this lab has become easier than ever before. Teams that follow agile software development methodologies can conduct phase-end demonstrations of functional and non-functional requirements in this mini-lab to avoid unpleasant surprises in the end.

So here’s to real IT that works for the customer, and for you!

Implementing these methodological and effective approaches to software requirements gathering helps the architects collect, segregate, prioritize, analyze, and document all the relevant informational and process needs for the application under design. This understanding of software requirements gathering will help give you a competitive edge over others.

Jul 3, 2009

Ten Requirement Traps...

Author: Karl E. Wiegers

The path to quality software begins with excellent requirements. Slighting the processes of requirements development and management is a common cause of software project frustration and failure. This article describes ten common traps that software projects can encounter if team members and customers don’t take requirements seriously. I describe several symptoms that might indicate when you’re falling victim to each trap, and I offer several solutions to control the problem.

Be aware, though, that none of these solutions will work if you’re dealing with unreasonable people who are convinced that writing requirements is time-wasting bureaucratic overhead. To persuade such skeptics, present data such as that from the Standish Group’s CHAOS report - a study of 8,380 IT projects which found that more than half were "challenged," with reduced functionality being delivered over-budget and beyond the estimated schedule. The top three contributing factors on challenged projects were lack of user input (12.8% of projects), incomplete requirements and specifications (12.3%), and changing requirements and specifications (11.8%).

Trap #1: Confusion Over "Requirements"

Symptoms: Even the simple word "requirements" means different things to different people. An executive’s notion of "requirements" might be a high-level product concept or business vision, while a developer’s "requirements" might look suspiciously like detailed user interface designs. Customer-provided requirements often are really solution ideas. One symptom of potential problems is that project stakeholders refer to "the requirements" with no qualifying adjectives. The project participants therefore will likely have different expectations of how much detail to expect in the requirements.

Another symptom is that the users provide "the requirements," but developers still aren’t sure what they’re supposed to build. If requirements discussions focus exclusively on functionality, the participants might not understand the various kinds of information that fall under the broad rubric of "requirements." As a consequence, important stakeholder expectations might go unstated and unfulfilled.

Solutions: The first step is to recognize that there are several types of requirements, all legitimate and all necessary. A second step is to educate all project participants about key requirements engineering concepts, terminology, and practices.

I think in terms of three levels of requirements, all of which must be addressed during requirements development (Figure 1). At the top are the business requirements, representing the high-level objectives of the organization or customer requesting the system or product. They describe how the world will be better if the new product is in it. You can record business requirements in a product vision and scope document.

The second level addresses the user requirements, which describe the tasks that users must be able to perform using the new product. These are best captured in the form of use cases, which are stories or scenarios of typical interactions between the user and the system. However, the use cases alone often don’t provide enough detail for developers to know just what to build. Therefore, you should derive specific software functional requirements—the third requirements level—from the use cases. The functional requirements itemize the specific behaviors the software must exhibit.

The software requirements specification (SRS) serves as a container for both the functional requirements and the nonfunctional requirements. The latter include quality attribute goals, performance objectives, business rules, design and implementation constraints, and external interface requirements. Quality attributes (such as usability, efficiency, portability, and maintainability) need to be elicited from users, along with the use cases.

Trap #2: Inadequate Customer Involvement

Symptoms: Despite considerable evidence that it doesn’t work, many projects seem to rely on telepathy as the mechanism for communicating requirements from users to developers. Users sometimes believe that the developers should already know what users need, or that technical stuff like requirements development doesn’t apply to users. Often, users claim to be too busy to spend the time it takes to iteratively gather and refine the requirements. (Isn’t it funny how we never have time to do things right, but somehow we always find the time to do them over?)

One indication of inadequate customer involvement is that user surrogates (such as user managers, marketing staff, or software developers) supply all of the input to requirements. Another clue is that developers have to make many requirements decisions without adequate information and perspective. If you’ve overlooked or neglected to gather input from some of the product’s likely user classes, someone will be unhappy with the delivered product. On one project I know of, the customers rejected the product as unacceptable the first time they saw it, which was at its initial rollout. This is a strong—but late and painful—indication of inadequate customer involvement in requirements development.

Solutions: Begin by identifying your various user classes. User classes are groups of users who differ in their frequency of using the product, the features they use, their access privilege level, or in other ways.

An effective technique is to identify individual "product champions" to represent specific user classes. Product champions collect input from other members of their user class, supply the user requirements, and provide input on quality attributes and requirement priorities.

This approach is particularly valuable when developing systems for internal corporate use; for commercial product development it might be easier to convene focus groups of representative users. Focus group participants can provide a broad range of input on desired product features and characteristics. The individuals you select as user representatives can also evaluate any prototypes you create, and review the SRS for completeness and accuracy. Strive to build a collaborative relationship between your customer representatives and the development team.

Trap #3: Vague and Ambiguous Requirements

Symptoms: Ambiguity is the great bugaboo of software requirements. You’ve encountered ambiguity if a requirement statement can have several different meanings and you’re not sure which is correct. A more insidious form of ambiguity results when multiple readers interpret a requirement in different ways. Each reader concludes that his or her interpretation is correct, and the ambiguity remains undetected until later—when it’s more expensive to resolve.

Another hint that your requirements are vague or incomplete is that the SRS is missing information the developers need. If you can’t think of test cases to verify whether each requirement was properly implemented, your requirements are not sufficiently well defined. Developers might assume that whatever they’ve been given in the form of requirements is a definitive and complete product description, but this is a risky assumption.

The ultimate symptom of vague requirements is that developers have to ask the analyst or customers many questions, or they have to guess about what is really intended. The extent of this guessing game might not be recognized until the project is far along and implementation has diverged from what is really required. At this point, expensive rework may be needed to bring things back into alignment.

Solutions: Avoid using intrinsically subjective and ambiguous words when you write requirements. Terms like minimize, maximize, optimize, rapid, user-friendly, easy, simple, often, normal, usual, large, intuitive, robust, state-of-the-art, improved, efficient, and flexible are particularly dangerous. Avoid "and/or" and "etc." like the plague. Requirements that include the word "support" are not verifiable; define just what the software must do to "support" something. It’s fine to include "TBD" (to be determined) markers in your SRS to indicate current uncertainties, but make sure you resolve them before proceeding with design and construction.

To ferret out ambiguity, have a team that represents diverse perspectives formally inspect the requirements documents. Suitable inspectors include:

  • the analyst who wrote the requirements
  • the customer or marketing representative who supplied them (particularly for use case reviews)
  • a developer who must implement them
  • a tester who must verify them

Another powerful technique is to begin writing test cases early in requirements development. Writing conceptual test cases against the use cases and functional requirements crystallizes your vision of how the software should behave under certain conditions. This practice helps reveal ambiguities and missing information, and it also leads to a requirements document that supports comprehensive test case generation.

Consider developing prototypes; they make the requirements more tangible than does a lifeless textual SRS. Create a partial, preliminary, or possible implementation of a poorly understood portion of the requirements to clarify gaps in your knowledge. Analysis models such as data flow diagrams, entity-relationship diagrams, class and collaboration diagrams, state-transition diagrams, and dialog maps provide alternative and complementary views of requirements that also reveal knowledge gaps.

Trap #4: Unprioritized Requirements

Symptoms: "We don’t need to prioritize requirements," said the user representative. "They’re all important, or I wouldn’t have given them to you." Declaring all requirements to be equally critical deprives the project manager of a way to respond to new requirements and to changes in project realities (staff, schedule, quality goals). If it’s not clear which features you could defer during the all-too-common "rapid descoping phase" late in a project, you’re at risk from unprioritized requirements.

Another symptom of this trap is that more than 90% of your requirements are classified as high priority. Various stakeholders might interpret "high" priority differently, leading to mismatched expectations about what functionality will be included in the next release. Sometimes developers balk at prioritizing requirements because they don’t want to admit they can’t do it all in the time available. Often users are also reluctant to prioritize because they fear the developers will automatically restrict the project to the highest priority items and the others will never be implemented. They might be right about that, but the alternatives can include software that is never delivered and having ill-informed people make the priority trade-off decisions.

Solutions: The relative implementation priority is an important attribute of each use case, feature, or individual functional requirement. Align use cases with business requirements, so you know which functionality most strongly supports your key business objectives. Your high-priority use cases might be based on:

  • The anticipated frequency or volume of usage
  • Satisfying your most favored user classes
  • Implementing core business processes
  • Functionality demanded for regulatory compliance

If you derived functional requirements from the use case descriptions, this alignment helps you implement the truly essential functionality first. Allocate each requirement or feature to a specific build or release.

Many organizations use a three-level prioritization scale. If you do, define the priority categories clearly to promote consistent classification and common expectations. A more robust solution is to analytically prioritize discretionary requirements, based on their projected customer value and the estimated cost and technical risk associated with construction. (A spreadsheet to assist with this approach is available online; see this article’s Web Infolink for more information.)

Trap #5: Building Functionality No One Uses

Symptoms: I’ve experienced the frustration of implementing features that users swore they needed, then not seeing anyone use them. I could have spent that development time much more constructively. Beware of customers who don’t distinguish glitzy user interface "chrome" from the essential "steel" that must be present for the software to be useful. Also beware of developer gold plating, which adds unnecessary functionality that "the users are just going to love." In short, watch out for proposed functionality that isn’t clearly related to known user tasks or to achieving your business goals.

Solutions: Make sure you can trace every functional requirement back to its origin, such as a specific use case, higher-level system requirement, business rule, industry standard, or government regulation. If you don’t know where a requirement came from, question whether you really need it. Identify the user classes that will benefit from each feature or use case.

Deriving the functional requirements from use cases is an excellent way to avoid orphan functionality that just seems like a cool idea. Analytically prioritizing the requirements, use cases, or features also helps you avoid this trap. Have customers rate the value of each proposed feature, based on the relative customer benefit provided if it is present—and the relative penalty if it is not. Then have developers estimate the relative cost and risk for each feature. Use the spreadsheet mentioned under Trap #4 to calculate a range of priorities, and avoid those requirements that incur a high cost but provide relatively low value.

Trap #6: Analysis Paralysis

Symptoms: If requirements development seems to go on forever, you might be a victim of analysis paralysis. Though less common than skimping on the requirements process, analysis paralysis results when the viewpoint prevails that construction cannot begin until the SRS is complete and perfect. New versions of the SRS are released so frequently that version numbers resemble IP addresses, and a requirements baseline is never established. All requirements are modeled six ways from Sunday, the entire system is prototyped, and development is held up until all requirement changes cease.

Solutions: Your goal is not to create a perfect SRS, but to develop a set of clearly expressed requirements that permit development to proceed at acceptable risk. If some requirements are uncertain, select an appropriate development lifecycle that will let you implement portions of the requirements as they become well understood. (Some lifecycle choices include the spiral model, staged release, evolutionary prototyping, and time-boxing.) Flag any knowledge gaps in your SRS with "TBD" markers, to indicate that proceeding with construction of those parts of the system is a high-risk activity.

Identify your key decision-makers early in the project, so you know who can resolve issues to let you break out of the paralysis and move ahead with development. Those who must use the requirements for subsequent work (design, coding, testing, writing user documentation) should review them to judge when it’s appropriate to proceed with implementation. Model and prototype just the complex or poorly understood parts of the system, not the whole thing. Don’t make prototypes more elaborate than necessary to resolve the uncertainties and clarify user needs.

Trap #7: Scope Creep

Symptoms: Most projects face the threat of scope creep, in which new requirements are continually added during development. The Marketing department demands new features that your competitors just released in their products. Users keep thinking of more functions to include, additional business processes to support, and critical information they overlooked initially. Typically, project deadlines don’t change, no more resources are provided, and nothing is deleted to accommodate the new functionality.

Scope creep is most likely when the product scope was never clearly defined in the first place. If new requirements are proposed, rejected, and resurface later—with ongoing debates about whether they belong in the system—your scope definition is probably inadequate.

Requirement changes that sneak in through the back door, rather than through an established and enforced change control process, lead to the schedule overruns characteristic of scope creep. If Management’s sign-off on the requirements documents is just a game or a meaningless ritual, you can expect a continuous wave of changes to batter your project.

Solutions: All projects should expect some requirements growth, and your plans should include buffers to accommodate such natural evolution. The first question you should ask when a new feature, use case, or functional requirement is proposed is: "Is this in scope?" To help you answer this question, document the product’s vision and scope and use it as the reference for deciding which proposed functionality to include.

Apparent scope creep often indicates that requirements were missed during elicitation, or that some user classes were overlooked. Using effective requirements gathering methods early on will help you control scope creep. Also, establish a meaningful process for baselining your requirements specifications. All participants must agree on what they are saying when they approve the requirements, and they must understand the costs of making changes in the future. Follow your change control process for all changes, recognizing that you might have to renegotiate commitments when you accept new requirements.

Trap #8: Inadequate Change Process

Symptoms: The most glaring symptom of this trap is that your project doesn’t have a defined process for dealing with requirements changes. Consequently, new functionality might become evident only during system or beta testing. Even if you have a change process in place, some people might bypass it by talking to their buddies on the development team to get changes incorporated. Developers might implement changes that were already rejected or work on proposed changes before they’re approved. Other clues that your change process is deficient are that it’s not clear who makes decisions about proposed changes, change decisions aren’t communicated to all those affected, and the status of each change request isn’t known at all times.

Solutions: Define a practical change control process for your project. You can supplement the process with a problem- or issue-tracking tool to collect, track, and communicate changes. However, remember that a tool is not a substitute for a process. Set up a change control board (CCB) to consider proposed changes at regular intervals and make binding decisions to accept or reject them. (See "How to Control Software Changes" by Ronald Starbuck in STQE, November/December 1999, for more about the CCB.)The CCB shouldn’t be any larger or more formal than necessary to ensure that changes are processed effectively and efficiently. Establish and enforce realistic change control policies. Compare the priority of each proposed requirement change against the body of requirements remaining to be implemented.

Trap #9: Insufficient Change Impact Analysis

Symptoms: Sometimes developers or project managers agree to make suggested changes without carefully thinking through the implications. The change might turn out to be more complex than anticipated, take longer than promised, be technically or economically infeasible, or conflict with other requirements. Such hasty decisions reflect insufficient analysis of the impact of accepting a proposed change. Another indication of inadequate impact analysis is that developers keep finding more affected system components as they implement the change.

Solutions: Before saying "sure, no problem," systematically analyze the impact of each proposed change. Understand the implications of accepting the change, identify all associated tasks, and estimate the effort and schedule impact. Every change will consume resources, even if it’s not on the project’s critical path. Use requirements traceability information to help you identify all affected system components. Provide estimates of the costs and benefits of each change proposal to the CCB before they make commitments.

Trap #10: Inadequate Version Control

Symptoms: If accepted changes aren’t incorporated into the SRS periodically, project participants won’t be sure what all is in the requirements baseline at any time. If team members can’t distinguish different versions of the requirements documents with confidence, your version control practices are falling short. A developer might implement a canceled feature because she didn’t receive an updated SRS. I know of a project that experienced a spate of spurious defect reports because the system testers were testing against an obsolete version of the SRS.

Using the document’s date to distinguish versions is risky. The dates might be the same but the documents may be different (if you made changes more than once in a day), and identical documents can have different "date printed" labels. If you don’t have a reliable change history for your SRS, and earlier document versions are gone forever, you’re caught in this trap.

Solutions: Periodically merge approved changes into the SRS and communicate the revised SRS to all who are affected. Adopt a versioning scheme for documents that clearly distinguishes drafts from baselined versions. A more robust solution is to store the requirements documents in a version control tool. Restrict read/write access to a few authorized individuals, but make the current versions available in read-only format to all project stakeholders. Even better, store your requirements in the database of a commercial requirements management tool. In addition to many other capabilities, such tools record the complete history of every change made in every requirement.

Keys to Excellent Software Requirements

While these ten traps aren’t the only ones lurking in the requirements minefield, they are among the most common and most severe. To avoid or control them, assemble a robust toolkit of practices for eliciting, analyzing, specifying, verifying, and managing a product’s requirements:

  • Educating developers, managers, and customers about requirements engineering practices and the application domain
  • Establishing a collaborative customer-developer partnership for requirements development and management
  • Understanding the different kinds of requirements and classifying customer input into the appropriate categories
  • Taking an iterative and incremental approach to requirements development
  • Using standard templates for your vision and scope, use case, and SRS documents
  • Holding formal and informal reviews of requirements documents
  • Writing test cases against requirements
  • Prioritizing requirements in some analytical fashion
  • Instilling the team and customer discipline to handle requirements changes consistently and effectively

These approaches will help your next product’s requirements provide a solid foundation for efficient construction and a successful rollout.