Oct 31, 2008

Errors in Leading Change / Transformation Efforts

John P. Kotter is an expert on Leadership and Change, with multiple books to his credit. From his observation of hundreds of companies, he writes that the lesson from the most successful is that “the change process goes through a series of phases that take a considerable time”. He also highlights eight principal errors in 'Leading Change', as below:
1. not establishing a great enough sense of urgency
2. not creating a powerful enough, guiding coalition
3. lacking a vision
4. under-communicating the vision by a factor of ten
5. not removing obstacles to the new vision
6. not systematically planning for, and creating, short-term wins
7. declaring victory too soon
8. not anchoring changes in the corporate culture

Oct 29, 2008

MRO Business Priorities

MRO providers shift their priorities
DATE:28/10/08
SOURCE:Airline Business
By Niall O'Keeffe

Margins are tightening in airframe maintenance. The consequence is a clear trend among major maintenance, repair and overhaul providers to prioritise the more lucrative areas of component and engine maintenance. However, the labour-intensive spanner work cannot simply be abandoned. "We are not excluding anything because our customer cannot exclude some of the services," says August Henningsen, chief executive of Lufthansa Technik, which draws 60% of its maintenance volume from third-party customers. "He simply has to have a partner which is able and in a position to competitively service the whole range of services needed to safeguard his operation."

Lufthansa Technik's solution has been to push airframe work from its Hamburg base to lower-cost centres in Hungary, Malta, Bulgaria and the Philippines, as part of its "global network" strategy. A similar evolution has occurred at Europe's other colossal airline-affiliated MRO provider, Air France Industries, which merged with KLM Engineering & Maintenance in 2004, and which today draws 35% of its volume from third parties.

"There has been a shift from part of the services we used to provide the market with to other, more profitable services in Europe," says Air France Industries executive vice-president business development Bruno Delile. "And at the same time we entered into some partnerships to find solutions for heavy airframe maintenance. In components, we grow our business 15% every year. This impact is somehow hidden by what we do on the airframe side."

Airframe maintenance appears to be losing its allure not just in Europe, but in the US: Delta Air Lines' maintenance unit Delta TechOps has entirely sub-contracted its heavy maintenance, with Aveos (formerly Air Canada Technical Services) among the beneficiaries. However, some operations in South America and Asia are looking to scale up their airframe capabilities. In 2007, ST Aerospace sought to capitalise on China's low labour rates when it launched Shanghai Technologies Aerospace Company (STARCO) as a joint venture with China Eastern Airlines, investing $38 million in a new hangar at Pudong Airport. Scheduled to open in mid-2009, the hangar will be capable of simultaneously accommodating three narrowbodies and two widebodies (including the Airbus A380). It will bring ST Aerospace's total hangar capacity to 45 narrowbody and 27 widebody slots.

Meanwhile, VEM, the Brazilian MRO ¬provider that emerged from the bankruptcy of Varig, plans to open a new hangar capable of accommodating six widebodies in Rio de Janeiro in 2010. Portuguese airline TAP acquired a controlling interest in VEM in 2005, and uses its facilities to achieve airframe volume growth that is impossible at its capacity-constrained Lisbon facility, at a lower labour cost.

"Our main interest is full-maintenance contracts," says Jorge Sobral, TAP's director of maintenance, who oversees a business that draws 50% of its volume from third parties. "We do need the airframe business because it's very interesting from the point of view of a package. But if you take it in segments, the airframe business is not that interesting...We count on VEM to do some airframe work - there is the same margin for it there."

Characterising Latin American airlines as particularly price sensitive, VEM vice-president of sales and marketing Nestor Koch puts a figure on his target margin: "When we reach 10% we are really happy."

Amid the boom in aircraft orders from its petrodollar-rich, state-owned airlines, the Middle East has been mooted as a major maintenance hub of the future, partly due to the grand plans of Dubai Aerospace Enterprise (DAE), a bold, $15 billion attempt to build an aerospace giant from scratch.

LOSING DIRECTION

DAE served notice of its MRO ambitions with the acquisition of US providers Standard Aero and Landmark Aviation. However, one industry commentator expresses concern that the organisation has lately appeared "rudderless" after the exit of senior executives and the abandonment of plans to establish a DAE University. One MRO chief executive even suggests that "the whole thing is unwinding".

Yet DAE was one of the three members of a consortium that acquired MRO giant SR Technics for $1.35 billion in 2006, the others being state-owned Dubai investment house Istithmar and Abu Dhabi equivalent Mubadala, which also owns Abu Dhabi Aircraft Technologies (ADAT), formerly GAMCO. The Mubadala link perhaps raises the prospect of an ADAT/SR Technics merger.

A familiar theme emerges when ADAT chief executive John Byers explains the ¬strategy the company has pursued since its rebranding in May 2007. "We're trying to refocus the company on being much more of a total-care provider," he says. "Previously the company has been very airframe-maintenance-centric so we're trying to move the model to being much more across the value chain of MRO - engineering support, fleet management, configuration control."
Local competition is intensifying, says Byers, noting that JoRAMCo is firmly established, and that ST Aerospace, Lufthansa Technik and Air France-KLM have been eyeing opportunities in the region. "Bees are attracted to a honeypot, aren't they?"

Still, ADAT has capacity available for local work. "At the moment we're probably doing 1.8-1.9 million man-hours of airframe a year and probably only 40-45% of it is for local consumption. The rest of it we import from western and eastern Europe. There's an awful lot of capacity available here for the region."

ADAT has, however, exercised caution in scaling up capacity to meet forecast demand. Says Byers: "We're looking at reasonably proven demand in our capacity, like this new hangar we're putting in. We don't have any problems in filling that - we know just from demand that we're turning away from this point in time."

A Middle Eastern location carries the benefits of high availability of skilled labour and lack of exposure to the weak dollar, since the UAE dirham is pegged to the US dollar (a benefit until the dollar starts to rise in value, at least). The region's labour rate, meanwhile, reflects its geography: it's roughly halfway between those of Europe and Asia. "We are certainly not as cheap as China," says Byers.

However, western maintenance providers have struggled to gain access to China. "It is a very special market, so for a while we did try it, but then we just gave up," recalls TAP's Sobral. "I'm not saying it's not an interesting market, but it requires lots of patience and lots of money."
David Stewart, a principal at aerospace consultancy AeroStrategy, suggests that China will be "an MRO hub for itself, especially in the short- to medium-term", while Korea and Japan could become centres of excellence for some component and engine work. Airframe maintenance centres might emerge in Latin America and North Africa. "The big question is whether big European carriers will send heavy checks to Asia-Pacific because it hasn't been a very prevalent practice," says Stewart. "It's relatively well-established practice in the US to outsource but the Europeans haven't really got the bug."

FUEL PRICE EFFECT

One theory is that high fuel prices have made airlines reluctant to countenance long ferry flights. However, Delta TechOps chief executive Tony Charaf has no truck with this theory. "I have never witnessed someone saying, 'Well, I'm not going to send it to you because you are far away.' Maybe this used to be said 20 years ago but it's not any more."

In Europe, 47% of airframe maintenance is outsourced, with 76% of that staying in the region and 12% Asia-bound, according to TeamSAI figures published in April. In North America, outsourced airframe work makes up 64% of the total, and 26% of it goes to Asia. Asia outsources 56% of its airframe work, and 93% stays in the region.

Meanwhile, in engine maintenance, North America outsources 77% of work, Europe 71% and Asia 73%. While North America and Europe keep large majorities of outsourced work within their respective regions - 75% and 71% respectively - Asia sends a total of 45% to Europe and 28% to North America.

Globally, 53% of heavy maintenance work is outsourced, compared with 75% of engine maintenance, 77% of component maintenance and 16% of line maintenance.
As to the likely future structure of the ¬maintenance, repair and overhaul industry, Stewart's expectation is that it will ¬consolidate around four or five "global integrators", perhaps comprising Lufthansa Technik, Air France-KLM, ST Aerospace and SR Technics/ADAT. "They will invest to get a global footprint," he predicts. "Over the next 18 months, two years, you might see some reasonably priced acquisitions available, so more changes in ownership are likely."

Delile of Air France Industries likewise sees room for consolidation in the market. "Most of the players have less than 10%," he says. "Even the biggest have less than 10% market share, so there's still room for consolidation in this market." He adds that the need for scale in MRO is such that partnerships between maintenance providers, such as Air France Industries' component partnership with Lufthansa Technik, are starting to become more common.
There's a broad consensus, however, that there will remain room for niche, independent players. But, in the absence of economies of scale, only dedicated, high-margin services would be viable for such players.

AeroStrategy has suggested the intriguing possibility that Boeing and Airbus may look to sell integrated MRO contracts to airlines placing orders for their next-generation single-aisle aircraft. Such contracts might include airframe/component maintenance, rotable logistics and fleet management.

Naturally, many in the market would not welcome such a move. Sobral equates it to competing with one's customers. "There was a serious problem, years ago, when the engine OEMs [original equipment manufacturers entered the MRO business," he recalls. "I think everybody considers that to be a bad experience. So I think it is not going to be repeated." Sobral hails the Airbus MRO Network established by the airframer as "a good approach" to aftermarket involvement.
Meanwhile, Boeing's 787-focused lifecycle management programme appears to be ¬struggling to find favour with customers, and a strategic rethink would seem likely.

STRONG INDEPENDENTS

Shifting focus to the engine maintenance sphere, independents such as MTU, Standard Aero and ST Aerospace are likely to remain "fairly strong", Stewart reckons, but the row over installing non-OEM (or third party spares manufactured) parts in engines will eventually come to a head. "The independents basically have to decide whether they're with the OEM or against the OEM."

In addition to varying by region, airlines' propensity to outsource naturally varies by fleet type. "Obviously the biggest segment of the market in terms of outsourcing of maintenance is the low-cost carriers," notes Tay Khiang Kok, president of ST Aerospace. "So on the narrowbody aircraft you find that the tendency is to outsource. And outsource providers like ourselves are able to offer total solutions, so they don't need to have a big management structure to manage that. For the larger new platforms, while historically most airlines tend to do work in-house on platforms such as the A330, A340, 777, etc, in the last five years I think that there is a trend for ¬airlines to consider outsourcing, the latest being Singapore Airlines' acquisition of 19 A330s from Airbus. Although they have significant in-house MRO capabilities, they have decided to outsource everything on that platform, and the outsourcing is done through Airbus. We are fortunate to be one of the beneficiaries of that, but you see that many other airlines around the world continue to go in that direction."

As aircraft reliability and economics improve, the rationale to invest in in-house capability is reduced. "A third-party provider such as ourselves can make the same ¬investment but support a much larger fleet from a mix of clients," argues Tay. "In that context, the cost ratio makes it uneconomic for people to try to do it themselves even if they want to." By the same logic, the efficiency of the newest airframes has created overcapacity in the mature markets - Europe and the US - with fuel price volatility speeding the process of fleet renewal.

Meanwhile, a new generation of airlines is emerging to which maintenance is decidedly non-core. "The trend is not that people who used to do their maintenance are now outsourcing," argues Sobral. "The real trend is that you are seeing a lot more small airlines popping up and, for them, it doesn't make sense from an economical point of view to do maintenance."

In Delile's experience many airlines still choose to outsource some types of maintenance on an ad hoc basis, rather than sign up to all-encompassing by-the-hour deals in which risk is neutralised under a fixed-price arrangement. "Most of the newcomers are looking for integrated solutions, but at the same time, they still split along the segments," he says.

"They look for by-the-hour agreements for component support but not as much for engines. Being very limited in cash they postpone some cost exposure later in the operations, so they take the risk and go for engine support on a case-by-case, engine-by-engine basis. Total support, or at least support that relies on different segments such as components, engines and airframe maintenance, happen from time to time but are not so common in the end."

MRO IN A RECECSSION

Opinion is divided on how severe will be the impact of the recession on the maintenance, repair and overhaul business. The optimists note that maintenance cannot be deferred for ever, or opine, very optimistically, that the MRO business has been decoupled from the airline industry.
Pessimists point to an oil price that remains punishingly high despite recent drops, and suggest that, combined with the spiralling financial crisis, this could bring airline bankruptcies and mass retirement of aircraft in 2009. Air France Industries executive vice-president business development Bruno Delile raises questions about "the profitability of some 10- to 15-year contracts that were signed in the past years, with optimistic assumptions", though he excludes his own company from such worries.

As ever, hard times will create opportunities for some. Delta TechOps, for example, sees potential for increased lessor business. "The market is shifting a little bit because on one had we can see that reduction in capacity is impacting our by-the-hour [engine maintenance] agreements," notes chief executive Tony Charaf. "On the other hand we see some improvements and growth with the lessors. We're doing quite a bit of work for ILFC, which is repackaging some of its airplanes and engines."

Delta TechOps has won both engine and airframe maintenance contracts from the AIG-owned lessor, and is now seeking to market nose-to-tail, "fleet-complete" maintenance services to the wider lessor community. "That is a very attractive value proposition for the lessors," insists Charaf, adding: "Lessor business can be tremendously complementary when we need it the most."

Oct 22, 2008

Why a Project Fails?

Here is a link into a very good article on "How to spot a failing Project", from an interview by AtTask CEO Scott Johnson for CIO Magazine:

http://www.attask.com/images/library/CIO_Article.pdf


Oct 16, 2008

Coping with Scope: Eight Real-World Strategies

Good set of lessons in this article by Michael Wood, which appeared in gantthead:


If history has taught us anything it is this: “No matter how well a business application project’s scope is defined, it changes time after time.” Managing the scope of a project is always plagued with some form of scope creep. Scope creep has been the bane of project managers since project management began. The scope of project is somewhat fluid in nature and tends to morph as the project progresses. Like hurricanes, the path followed can only be projected within a certain margin of error. However, hurricane path forecasting utilizes different models, each based on a series of uncontrollable factors that can and do change over the course of its life. The closer the hurricane is to landfall, the more accurate the projections.

Unfortunately, most scope-management frameworks are designed around the definition of a finite scope based on limited knowledge and advocating tight controls to manage change. Scope changes can be driven by many factors, including new ideas, regulatory change, change of needs, poor understanding of requirements, heuristic discoveries, financial circumstances, changes in leadership and more. In addition, in the absence of an agreed-upon objective and quantitative methods assessing the impact that scope changes will have on the success of the project, emotions and politics will most likely rule the day.

The challenge is how to weave change and scope recalibration rules into the fabric of the project that proactively allows for resources, budgets and delivery times to change without attracting management’s ire. Here are eight strategies you might find useful in meeting the scope management challenge:

1. Use a Discovery Phase to establish a stable scope

One of the quickest ways to improve your ability to develop an accurate and creep resistant scope is to conduct a “scope discovery phase” out of which a detailed understanding of deliverables will be developed. Typically, these phases are like mini design phases with requirements traceability from objectives through workflows to applications, programs and data structures. The result is a very detailed list of deliverables making it easier to spot any additions to the mix. In addition, since the deliverables can be classified as to their complexity and type, it is possible to use standard estimating metrics to compute the effort needed for completion. Finally, understanding the business processes, applications, programs and data structures in play allows you to identify the talent and resources needed to support the effort. Discovery Phases typically take from one to three months to complete and consistently yield scopes that are 95 percent accurate (and that ain’t bad!).

2. Develop formula- and event-driven models for establishing budget needs, resource requirements and delivery dates

Imagine a project scope that was virtual in that it was constantly recalibrated based on predefined criteria and events. Only the most uninformed and naïve believe that the factors that influence a project remain static over the life of that project. Every experienced project manager knows that the scope set at the beginning of a project in terms of budget and deliverables is at best an educated “best guess” at the time and is going to change; thus the reason for “change orders”.

A mature management will want to approach projects in a way that the remaining time to complete and monies that need to be spent reflect the most accurate appraisal of reality that can be had. However, in most cases management wants to cast early estimates in concrete and threaten grave punishment to the project manager should they miss budgetary and delivery date targets. This in turn often incents those leading the project to lie about progress, representing to management that the project—amazingly--is as complete as the monies that have been spent. The old adage that “project progress can be declared on track right up to the remaining 10 percent of the effort” has roots in this contradiction--and management’s stupidity in such matters.

A more mature and sane approach to managing projects is to recognize from the beginning that events can occur that would substantially impact the project’s budget and delivery date. Based on this analysis a set of planned recalibrations can be forecast along with the trigger points that would indicate a change in scope was needed. Being proactive in this regard is the key to being intelligent about true scope management.

3. Drive scope changes based on delivery date impact

Truth be known, when push comes to shove, delivering a project on time is more important than delivering it on budget about 99 percent of the time. This is because any project that sports an attractive ROI is worth having sooner than later. In addition, most mission-critical projects have a window of opportunity that, once closed, might not reappear for some time. Using a Delivery Date-driven approach to scope management provides a great yardstick for evaluating whether a change in scope is worth the acceleration of delay of the project’s due date.

Under this method, the cost of the change would be equal to the actual cost to perform the work plus/minus the loss/gain in return. This pendulum swings both ways as sometimes the elimination of a deliverable can shave precious time off the delivery date. For example, assume a set of deliverables (not functionally critical of course) were estimated to cost about $75,000 and take two months to deliver. If the original project budget were $5 million and the estimated return was 20 percent, then the monthly value of the return would be over $80,000 a month. Therefore, to add this change to the project would have a cost of $235,000 (75k + (80k X 2), while deleting these deliverables would have a equivalent savings. This approach can be very sobering to management and keep things very honest and above board.

4. Build recalibration point into the project plan based on changes to external factors and knowledge gains

For over 12 years, I have been building recalibration points into project workplans. These points often coincide with milestones or phase breaks and by design are planned opportunities to revisit the scope of the project and its value to the organization. Not once has management seen this as an issue--it has embraced the forward-thinking it represents, providing them options at critical junctures during the project. Each recalibration point consists of a set of tasks that include validating the delivery time, resources requirements, opportunities for acceleration, assessment of new risks, market conditions, external events and of course a recasting of the budget. Once completed, a “go forward” recommendation is submitted to management and--if approved--the project continues.

These short sanity checks only take a few hours to perform because they are planned, and most of the work completed before the date due. There are times that without the use of this strategy, projects that ended up being successful might have crashed and burned in failure.

5. Drive budgets and delivery dates using more granular deliverable definitions

In September of 2007, gantthead published my article entitled “Identifying Requirements from BPI Documentation”, where I presented a method for extrapolating very granular requirements from high-level BPI documentation. By granular I am referring to every explicit and implicit input, process and output that is needed to support the improvement opportunities indentified in a BPI initiative. This same approach works outside the BPI environment and is based on a set of rules that can be applied to any set of processes and data structures. I encourage you to read this article--the approach has been well-tested and goes hand-in-hand with the discovery strategy previously presented.

6. Add a new deliverable assessment/acceptance process to the project governance framework

Nothing vets a proposed change to a project’s scope than a pre-defined process for assessing and evaluating the change requests. As stated in the beginning of the article, people are going to change their minds about what they need and want—it’s just part of human nature. To suppress this process is to invite people to buy out of the project and become points of continued angst and risk. Every week, change requests should be consolidated and an associated impact analysis performed. Then, as part of the normal project portfolio status meetings the requests should be scored and ranked based on the assessment criteria (i.e. value to project, impact on delivery date, cost, resource availability, trade-offs, etc.). The project plan is updated (budgets, timetables, etc.) for changes that are approved. In this way, the change process is orderly and manageable and--voila!--scope creep a thing of the past.

7. Allow for a deliverables trade-off process

Sometimes, requested increases to the scope to a project can be accompanied with offsetting scope reductions. This is often the case when budget is rigid and, in essence, the organization wants as much as it can get for a finite investment. Under this strategy, people requesting new deliverables must also be willing to trade-out other deliverables. Just like in the above strategies, this is best accomplished using a predefined set of evaluation criteria so the value of the trade-offs can be quantified, reducing the emotional side of the equation in the decision process as much as possible.

Once again, the project plans are recalibrated to reflect the changes approved and things continue on, business as usual.

8. Create a “time boxes” releases strategy

“Time boxing” is a well-accepted method for chunking deliverables into a series of smaller groups that can be delivered quickly. Not all projects lend themselves to time boxing, but many do. The most difficult part of this strategy is to get people to accept a partial set of deliverables. Often, those using business applications are fearful that they will only get one chance to get what they want and thus pile on the requirements until the project is so big and costly they end up with nothing at all. This of course reinforces their fear, and thus a cycle of self-fulfilling prophecies occurs.

The interesting dynamic is that once time-boxed projects are successful, the user population usually insists on this approach on all future projects. This presents an excellent opportunity to implement a formal release strategy that offers upgrades to the application base on a quarterly or semi-annual basis. Once in place, maintenance costs are typically reduced as a much more prudent approach to change is management is employed. Under the release strategy approach, requests for application improvements are accumulated and mapped into the existing application base.

Similar requests can thus be combined to take advantage of any economies of scale that might exist. This reduces the overall cost and labor that would otherwise be experienced. The improvement requests are then parsed into a series of logical releases based on what can be accomplished in three- to six-month segments. Few IT organizations ever really get this level of order and stability to their project environment when it comes to the care and feeding of the installed application base. Of course, this approach does not lend itself to new application deployments like an ERP, CRM or data warehouse project.

Summing it up

Armed with eight real-world strategies, you are ready to tackle and master the process of project scope management. Scope creep should be a thing of the past and, if successful, you should expect your PM prowess to be that of legend. Good luck!

Oct 13, 2008

Product Manager’s key to success

I just happened to see this quote from Bill Cosby.

“I don’t know the key to success, but the key to failure is trying to please everybody”

How appropriate for product managers?

All product managers should have this quote stuck next to their desks so that it is in your face as a reminder. We cannot build a product that is good for everyone - pick the target buyer (who will buy) and then execute like hell. Use the target buyer to handle all the “what if we do this …” or “what if the user wants to do this …” ideas people throw at you.

- Gopal Shenoy

Project Management - Art as well as Science

MULTINATIONAL COMPANY ERP IMPLEMENTATIONS: THEIR EFFECT ON THE ORGANIZATION, THE WORKPLACE AND INDIVIDUALS AT WORK

Follow the link below for a paper by John Gunson and Jean-Paul de Blasis on evolution of Project Management from early 1990s to date (what follows is the introduction piece from the paper):

http://hec.info.unige.ch/recherches_publications/cahiers/2003/2003.02.pdf

At the beginning of the 1990s ERP Implementation Projects followed a classic approach to Project Management. Once Top Management had decided on the ERP solution to be implemented, usually with an Editor such as SAP (the leader), ORACLE Applications, J D EDWARDS, PEOPLESOFT or BAAN, then a Project Manager was designated. Often this was the I.T. Manager who needed to assume the Project Manager role as well.

Helped by the Editor, the Project Manager itemized in detail the tasks to be carried out, attached resources to these tasks and fit the time-scales and budget as per Top Management guidelines/directives. Tools were available to help this process - for example Microsoft Project. This allowed the preparation of a Gantt Chart, and use of Critical Path and techniques to monitor Project progress.

As the decade progressed there was a natural evolution. The tools became more sophisticated allowing for what if scenarios, and Project slippage could be automatically evaluated if a task or set of tasks took longer. There was a tendency for Editors to set up strategic partners: Integrators, who worked with their customers to achieve implementation.

But the approach remained scientific, and a drawback was that slippage (delays, costs, deliverables) tended to be identified but after the fact. Actually ERPs proved more difficult to implement than anticipated with escalating delays and cost overruns. The Project Manager was looking in the rearview mirror and constantly correcting. What was needed was a proactive approach which allowed the Project Manager to anticipate problems and if possible avoid them or at least plan for them and have contingencies.

At the same time that the classic Project Management approach was being seen as incomplete, experience was showing another interesting characteristic: that the failure factors difficult to correct were often human related rather than technical.

In other words, it was not simply a matter of ticking off tasks done. There were ‘feelings’ involved which could lead to latent or evident resistance to change.

From the literature: Ann Miller says in an article with the organizational change theme ‘Some plan and lead change, others manage it, still others accommodate change, and many simply try to cope with it” (MILLER, 2001).

In an article also on the theme of organizational change, Pettigrew, Woodman and Cameron throw down the gauntlet for future research by suggesting that Management scholars are curiously incurious about why and how certain organizations consistently outperform their competitors. They note also that the link between change capacity and action to organizational performance is not clearly sought in empirical studies. (PETTIGREW, WOODMAN, CAMERON, 2001)


Read more by clicking the above link!

Sep 30, 2008

Training Effectiveness...

Here is a link to a very insightful article (if you can patiently click through the pages) titled, POST-IMPLEMENTATION USABILITY OF ERP TRAINING MANUALS: THE USER'S PERSPECTIVE by Scott, Judy E:

http://www.allbusiness.com/management/912850-1.html

HEADNOTE
Training users is critical to the success of ERP implementations. An important aspect of training is documentation in the form of training manuals. However, the effectiveness of the training manuals will depend on their perceived usability. In this study, data on users' perceptions of ERP training manuals, more than two years post-implementation, are analyzed for usability dimensions of task support, learnability, navigation, and presentation.

PROBLEMATIC ERP IMPLEMENTATIONS are often associated with inadequate user training (Brown and Vessey, 2003; Roberts et al., 2003; Scott and Vessey, 2002). In a recent study of 30 manufacturing firms, user training was their top ERP problem (Duplaga and Astani, 2003). Training is consistently an under-budgeted item and is often the first item cut in the budget (Slater, 1998), despite Gartner's finding that each hour of effective training is worth five hours to the organization because well-trained users (1) reach the required skill level in less than a quarter of the time, (2) require less assistance from peers and help desks, and (3) spend less time correcting errors (Aldrich, 2000). Organizations spend as much as 50 percent (Davenport 2000) to as little as 5 percent of their ERP project budget on training (Wheatley 2000). Gartner research asserts that companies allocating less than 13 percent of project costs to training are three times more likely to have their ERP projects fall short of business and project goals compared with companies that spend 17 percent or more on training (Aldrich, 2000; Burleson, 2001)...

Sep 25, 2008

Two Great Wastes and Underutilizaton of Human Potential

We can get some good insights into Communication and its impact on our potential, from the following piece and attached paper, by Hal Macomber and Gregory Howell:

Two Great Wastes™:

Not Listening

Not Speaking

We need a story that is embraced and retold that champions the success of teams who operate in a setting of respect and dignity speaking freely while engaging in deep listening.


Not listening has been cited as the source of the tragedies of the NASA Mars Climatic Orbiter and the Columbia shuttle. Not listening results in resignation and resentment as people attempt to change a situation only to find no appreciation.


Not speaking deprives others of wisdom, perspective, and insight. Not speaking is culturally reinforced at young ages. We learn that speaking up can lead to punishment. We stifle ourselves out of fear.


Both not speaking and not listening become habits in our life and in organizations. That is the good news. The habit can be changed. The initiative for change can come from anyone taking an act of leadership.


Greg and I claim listening is the master skill of the leader. A corollary to that skill is creating the circumstances for others to speak. The only thing keeping us from bringing forth that leadership is the current story about the exercise of power and control on projects and in organizations. We must change our story of how we are most effective. We need a story that is embraced and retold that champions the success of teams who operate in a setting of respect and dignity speaking freely while engaging in deep listening. Let's battle the Two Great Wastes...


Here is the link to their paper:

http://www.iglc2004.dk/_root/media/13105_079-howell-macomber-final.pdf



Sep 19, 2008

So You Want To Be a Requirements Analyst?

Highly Recommended Reading - Authored by Karl E. Wiegers, Process Impact, www.processimpact.com 1


Be it explicitly or not, someone always performs the role of requirements analyst on a software project. The official title may be requirements engineer, business analyst, system analyst, product manager, or simply analyst, but someone needs to translate multiple perspectives into a requirements specification and communicate with other stakeholders. Perhaps most importantly, the analyst helps determine the difference between what customers say they want and what they really need—and that’s easier said than done.

The Principal Conduit

The requirements analyst’s primary responsibility is to gather, analyze, document and validate the needs of the project stakeholders. As the principal conduit through which requirements flow between the customer community and the software development team, you’ll play a central role in collecting and disseminating product information, whereas the project manager takes the lead in communicating project information.

Requirements analyst is a project role, not necessarily a job title. One or more dedicated specialists can perform the role, or it may be assigned to any of a number of team members: the project manager, product manager, subject matter expert, developer or even a user. Nevertheless, a talented analyst can make the difference between project success or failure. In his book, Software Cost Estimation with Cocomo II (Prentice Hall PTR, 2000), Barry Boehm notes that seasoned analysts can reduce a project’s required effort by one third compared to similar projects with inexperienced analysts, and projects with highly skilled analysts require half the effort of those using the least capable analysts.

The Analyst’s Tasks

Straddling the gulf between vague customer ideas and the clear specifications that will guide the software team’s work, the analyst must first understand the users’ goals for the new system and then define functional and quality requirements that allow project managers to estimate, developers to design and build, and testers to verify the product. You can download a generic job description for a requirements analyst from http://www.processimpact.com/goodies.shtml. Here are the typical activities that you’ll perform while wearing the analyst’s hat.

Define Business Needs. Your work begins when you help the business sponsor or the product manager define the project’s business requirements. The first question to ask is, “Why are we undertaking this project?” Business requirements include a statement of the organization’s business objectives and the ultimate vision of what the system will be and do. Working with the people who hold this vision, you’ll help them express it by completing a vision and scope document template.

Identify Project Stakeholders and User Classes. The vision and scope document helps you identify the product’s important user classes and other stakeholders. Next, work with the business sponsors to select appropriate representatives for each user class, enlist their participation and negotiate their responsibilities. Write down the contributions that you’d like from your customer collaborators and agree on an appropriate level of participation from each one.

Elicit Requirements. Requirements for a software product don’t just lie around waiting for someone to collect them. A proactive analyst helps users articulate the system capabilities they need to meet their business objectives. Users naturally emphasize the system’s functional requirements, so steer discussions to include quality attributes, performance goals, business rules, external interfaces and constraints. It’s appropriate to challenge assumptions, but don’t try to force-feed users your own beliefs.

Analyze Requirements. Look for derived requirements that are a logical consequence of the customers’ requests, as well as hunting for those implicit requirements that they expect but haven’t verbalized. Spot the vague, weak words that cause ambiguity and confusion. Point out conflicting requirements and areas that need more detail. Specify the functional requirements at a suitable level of detail for the developers who implement them. A website being built incrementally by a small, well-synchronized team can get away with limited requirements documentation, but a complex embedded system to be outsourced to an offshore supplier needs a precise, detailed software requirements specification (SRS).

Write Specifications. Effective requirements development leads to shared understanding and creation of a system that addresses the customer’s problem. You’re responsible for writing well organized specifications that clearly express this shared understanding. Employing standard templates for use cases and the SRS accelerates requirements development by reminding you of topics that you need to discuss with users.

Model the Requirements. You’ll need to determine when it’s helpful to represent requirements with nontextual media, including graphical analysis models, tables, mathematical equations, storyboards and prototypes. Analysis models depict information at a higher level of abstraction than does detailed text. To maximize communication and clarity, draw analysis models according to the conventions of a standard notation such as the Unified Modeling Language.

Lead Validation. You must ensure that the documented requirements satisfy customer needs and that they’re clear, complete, correct, feasible, necessary, traceable, unambiguous, verifiable and so on. Analysts are the central participants in peer reviews of requirements documents. To ensure that requirements are interpreted correctly, you should also review designs, code and test cases based on the requirements specifications.

Facilitate Prioritization. You’ll broker collaboration and negotiation among the various user classes and developers to ensure that the right people make sensible decisions.

Manage Requirements. After establishing the requirements baseline, your focus will shift to managing those requirements and verifying their satisfaction in the product. Storing the requirements in a commercial tool designed for this purpose can help. You’ll want to track the status of individual functional requirements as they progress from inception to verification in the integrated product. Collect traceability information from team members to connect individual requirements to other system elements. This data will aid in managing changes to the baselined requirements within a change control process and tool.

Soft Skills

An effective analyst combines strong communication, facilitation and interpersonal ability with technical and business domain knowledge and the right personality for the job. Patience and a genuine desire to work with people are key success factors. Here are 10 soft skills that you’ll need to succeed.

1. Listening. Active listening involves eliminating distractions, maintaining an attentive posture and eye contact, and restating key points to confirm your understanding. You need to grasp what people are saying and also to read between the lines to detect what they might be hesitant to say.

Learn how your collaborators prefer to communicate and try to avoid imposing your personal filter of understanding on what you hear the customers say. Watch for assumptions that underlie both what you hear from others and your own interpretation.

2. Interviewing and Questioning. Most requirements input comes through discussions, so an analyst must be able to ask the right questions. For example, users naturally focus on the system’s normal, expected behaviors. However, every programmer knows how much code is needed to handle exceptions. Ask questions such as, “What should happen if...?” or “Could ever arise?” so you can determine how the system should handle anticipated exception conditions. With experience, you’ll become skilled in the art of asking questions that

reveal and clarify uncertainties, disagreements, assumptions and unstated expectations. Donald Gause and Gerald Weinberg describe “context-free questions” in Exploring Requirements: Quality Before Design (Dorset House, 1989).

3. Analytical. You’ll need to be able to operate at various levels of abstraction. Sometimes you must drill down from high-level information into details. In other situations, you’ll need to generalize from a specific need that one user described to a set of requirements that pertain to a whole class of users. Critically evaluate the information gathered from multiple sources to reconcile conflicts, separate user wants from needs, and distinguish solution ideas from requirements.

4. Facilitation. Requirements elicitation workshops are a common technique; to succeed, they require a neutral facilitator. You’ll need strong questioning and observational skills to help groups build trust and to improve the sometimes tense relationship between business and information technology staff. In Requirements by Collaboration: Workshops for Defining Needs (Addison-Wesley, 2002), Ellen Gottesdiener provides a wealth of advice for the workshop facilitator.

5. Observation. If you conscientiously watch a user perform his job or put a current application through its paces, you can detect subtleties that the user might not mention and thus expose new areas for requirements discussion.

6. Writing. Your main deliverable will be a written specification for customers, marketing, managers and technical staff; for this task, you need a solid command of the English (or other natural) language. Strive for clarity; avoid ambiguous words and phrasing, grammatical errors and overly idiomatic expressions.

7. Organization. You’ll be faced with a vast array of jumbled information gathered during elicitation and analysis. Structuring all the rapidly changing bits into a coherent whole demands exceptional organizational skills, along with patience and tenacity.

8. Modeling. From the venerable flowchart through structured analysis models (data flow diagrams, entity-relationship diagrams and the like) to contemporary UML notations, diagrammatic tools should be included in every analyst’s kit. Some of these techniques will be useful when communicating with users; others, with developers. You’ll often need to educate other stakeholders on the value of these techniques and how to read them—and you’ll find that these tools are useful ways to represent information even when you’re not discussing a computer system.

9. Interpersonal. You must be able to get people with competing interests to work together, and you should feel comfortable talking with individuals in diverse job functions and at all levels of the organization. You might also need to work with distributed teams whose members are separated by geography, time zones, cultures or native languages.

10. Creativity. The analyst is not merely a scribe who records whatever customers say. In his article, “Eureka! Why Analysts Should Invent Requirements” (IEEE Software, July/Aug. 2002), requirements authority James Robertson suggests that the best analysts propose requirements. Analysts might conceive innovative product capabilities, imagine new markets and business opportunities and think of ways to surprise and delight their customers. A really valuable analyst finds creative ways to satisfy needs that users didn’t even know they had.

Domain, Business and Task Knowledge

Enthusiasm alone won’t take you very far in requirements gathering; breadth of knowledge gained through experience is the only way to hone your ability. Start with a solid understanding of contemporary requirements-engineering techniques and how they fit in various software development lifecycles. Analysts need to know how to thread requirements development and management activities through the entire product lifespan. A sound understanding of project management, risk management and quality engineering can help prevent requirements issues from torpedoing the project. In a commercial setting, you’ll benefit from knowledge of product management concepts and the way enterprise software products are positioned and developed.


Application domain knowledge is a powerful asset for an effective analyst, minimizing miscommunications with users. Analysts who understand the application domain often detect unstated assumptions and implicit requirements. They can also suggest ways that users could improve their business processes. Such analysts sometimes propose valuable functionality that no user thought of. Conversely, they do a better job of detecting gold-plating—that is, excessive or unnecessary functionality—than does someone who’s unfamiliar with the problem domain.

Grown, Not Trained

There’s no standard educational curriculum or job description for a requirements analyst, which is why most come from diverse backgrounds. If you migrate into analysis from a career as a system user, you’ll need to balance your extensive knowledge of the business and work environment with supplemental training in software engineering and how to communicate with your technical counterparts. You’ll also have to work against any tendency to believe your user experience is all-encompassing, to focus excessively on the user interface, or to ignore input from real users of the new product. On the other hand, if you’re a former developer, you’ll need to beef up your understanding of the business domain and guard against lapses into technical thinking and jargon.

Whatever your background, training and mentoring in the soft skills that the best analysts master, such as effective listening, negotiating and facilitating, helps new analysts of all stripes uncover users’ unspoken desires.

Sidebar: Gathering Data

Try the following techniques to get the goods on requirements.

• Interviews

• Facilitated requirements workshops

• Document analysis

• Surveys

• Customer site visits

• Business process analysis

• Work flow and task analysis

• List of external events and corresponding system responses

• Competitive product analysis

• Reverse-engineering of existing systems

• Retrospectives performed on previous projects


1 This paper was originally published in Software Development, July 2003. It is reprinted (with modifications) with permission from Software Development magazine.